Principles and document templates · v1.0 · 25 September 2026

Settlement and ESG Star — package v1.0

Principles and document templates v1.0 published. The pilot starts once the documents are adopted and the implementation conditions are met.

We are sharing the principles and document templates v1.0. The pilot will start once the documents are adopted and the implementation conditions are met. The current panels present the method; they do not keep settlement accounts and do not issue certificates.

This package contains proposed pilot principles and document templates. Binding effect between parties requires completing the data, legal and tax review of the specific model, adoption of the relevant documents and signing of agreements. Publication alone does not start any settlement, grant any certification rights or change existing agreements or the current terms of service. Proprietary time limits and criteria are contractual proposals, not statutory requirements.

ESG Star brand architecture

  • ESG Star — the programme brand and future designation.
  • ESG Star Standard — the criteria and the evidence assessment procedure (E-01, E-02).
  • ESG Star Passport — an organisation's digital card: scope, period, evidence, verifier, status and validity date. At this stage a template only.

R-01 · v1.0

Pilot rules for cooperation and settlement — template

Template to be completed and adopted by the parties; requires legal and tax review for each specific implementation.

Version:
1.0
Date drafted:
25 September 2026
Status:
template to be completed and adopted
Operator:
[TO BE COMPLETED]
Approved by:
[TO BE COMPLETED]
Date adopted:
[TO BE COMPLETED]
Date of application:
[TO BE COMPLETED]

Scope: Organisation of a document-based B2B pilot.

Related Q&A: Q&A: Settlement 1–8

  1. Roles. The operator is [name, legal form, address, register, tax number, representation, contact — TO BE COMPLETED]. A participant is an entity that has concluded an accession agreement or R-02 incorporating R-01. The operator is responsible for its own coordination obligations; the transaction parties for their own performance.
  2. Accession. Accession requires verification of registration and representation, of the scope of resources offered, and acceptance of an identified version of the documents. The participant provides current data and reports material changes before the next transaction.
  3. Offer and transaction. Every offer and transaction is subject to individual acceptance. Silence or an entry in the demonstration panel does not constitute acceptance in this pilot. The card defines how the transaction is concluded and the required signatures, taking into account any form required by law.
  4. Documentation and register. Documentation comprises R-03, proof of performance, the accounting document, the R-04 agreement where applicable, and the remaining balance. The register organised by the operator mirrors the source documents; it does not replace the participant's books. Keeping the register starts only once L-01 is met.
  5. Risk and limits. Exposure limits are set by the parties concerned in writing or in another agreed permissible form. Exceeding them requires prior consent. Arrears or a justified dispute block new pilot transactions with that participant until clarified; the operator states the reason and how to present a position.
  6. Reports and corrections. Error reports are received at [address — TO BE COMPLETED]. Acknowledgement within 3 business days; response within 14 calendar days. Where further fact-finding is needed, the response states its scope and a proposed date. The procedure does not limit statutory claims or time limits. Corrections preserve the original content, reason, date and approvals.
  7. Fees. The price list [version/date — TO BE COMPLETED] or an order defines the amount, taxes, basis of charge, due date and refund rules. Without an accepted fee there is no basis to charge it under this template. A fee does not guarantee a partner or a business result.
  8. Exit. The participant terminates participation with a notice period of [TO BE COMPLETED]. From the effective end of accepting new orders, the parties settle existing obligations. End of participation does not extinguish debts or transfer them to the operator.
  9. Confidentiality and data. Confidential transaction data is shared with authorised persons to the extent necessary. Data protection roles, security measures and retention periods are defined in separate agreed documentation before launch; processor status requires assessment of the actual role.
  10. Amendments and disputes. Amendments must state version and date and be communicated [period — TO BE COMPLETED]. New terms apply to future transactions after acceptance. Existing agreements are amended as they themselves provide. Governing law and dispute resolution: R-02, subject to mandatory law.

Adoption: operator [signature/date]; participant [signature/date]; annexes and versions [list].

Sources: [1], [2]

R-02 · v1.0

B2B cooperation agreement — template

Template to be completed and adopted by the parties; requires legal and tax review for each specific implementation.

Version:
1.0
Date drafted:
25 September 2026
Status:
template to be completed and adopted
Operator:
[TO BE COMPLETED]
Approved by:
[TO BE COMPLETED]
Date adopted:
[TO BE COMPLETED]
Date of application:
[TO BE COMPLETED]

Scope: Framework commercial cooperation.

Related Q&A: Q&A: Settlement 1–3, 6–8

§1. Parties. This agreement is concluded between A [full details and representation] and B [full details and representation], the Parties. The operator [details] is a party only if it signs the agreement with a described scope of its own obligations.

§2. Subject and orders. The Parties cooperate in [description]. Each supply requires an R-03 card naming the supplier and the recipient. Accepting the framework agreement does not oblige a minimum number of orders unless the Parties add such an obligation: [text or "none"].

§3. Prices and taxes. The card sets the price, taxes, delivery cost and payment date. Each Party issues the proper documents for its own supply. Cash settlement is made to the designated account; contractual settlement on the basis of a separate agreement. The Parties check the applicable tax obligations before agreeing the settlement method.

§4. Performance and acceptance. The supplier performs in line with the specification and deadline. The recipient documents acceptance and any defects found. Defect remedy procedure, re-acceptance date and cost rules: [TO BE COMPLETED]. The protocol records findings while preserving rights under the agreement and the law.

§5. Liability. Each Party is liable for its own non-performance or improper performance under the applicable law. Additional security, penalties and liability caps require a separate lawful agreement [text or "none"]. The agreement does not exclude liability that cannot be excluded.

§6. Confidentiality. Information marked confidential or confidential by its nature is used to perform the agreement for [period]. Exceptions cover public information, information lawfully obtained independently and disclosures required by law. Disclosure is limited to what is necessary.

§7. Intellectual property. Rights to pre-existing materials remain with their holders. A licence or transfer of rights to a deliverable requires identifying the work, scope, fields of use, duration, territory, remuneration and required form in annex [number]. Acceptance of a deliverable alone does not replace these terms.

§8. Personal data. The Parties define their personal data roles [description] and legal bases. If processing is entrusted, they sign the proper agreement before any access to data. They minimise data and apply the agreed security measures [annex].

§9. Term and termination. The agreement is effective from [date] for [period]. Termination: [notice and method]. A material breach is subject to a notice to remedy within [period], with the option to terminate in line with the law and agreed terms. Termination does not affect settlement of performed supplies, confidentiality or archiving duties.

§10. Law and disputes. Governing law: [TO BE COMPLETED]. The Parties attempt to resolve a dispute amicably for [period], without limiting urgent remedies or statutory rights. Court or separately agreed mediation: [TO BE COMPLETED]. Amendments require [form appropriate to the act].

Signatures, dates, list of annexes: [TO BE COMPLETED].

Sources: [1], [2]

R-03 · v1.0

Transaction card and acceptance protocol — template

Template to be completed and adopted by the parties; requires legal and tax review for each specific implementation.

Version:
1.0
Date drafted:
25 September 2026
Status:
template to be completed and adopted
Operator:
[TO BE COMPLETED]
Approved by:
[TO BE COMPLETED]
Date adopted:
[TO BE COMPLETED]
Date of application:
[TO BE COMPLETED]

Scope: Documenting the offer, its acceptance and performance.

Related Q&A: Q&A: Settlement 2–3, 6

FieldContent to be completed
ID / version / date[ ]
Supplier / recipient / representation[ ]
Related agreement[ ]
Resource, specification, quantity and unit[ ]
Right to provide / required permits[ ]
Availability and offer validity[ ]
Net price / VAT or exemption / gross / PLN[ ]
Price justification / annex[ ]
Delivery, costs, risk, deadline[ ]
Acceptance criteria and quality documents[ ]
Payment date / settlement method[ ]
Maximum exposure / security[ ]
Rights to deliverables / licence[ ]
Party approvals / dates / form[ ]

Acceptance protocol: performed [scope] on [ ]; accepted [scope]; reservations [ ]; evidence [ ]; remedial actions, owner and deadline [ ]; re-acceptance [ ]; accounting document [identifier]; signatures [ ].

Correction: original version [ ]; reason [ ]; changed fields [ ]; effect on price and taxes [ ]; approvals [ ].

Sources: [1], [2]

R-04 · v1.0

Multilateral settlement agreement — template

Template to be completed and adopted by the parties; requires legal and tax review for each specific implementation.

Version:
1.0
Date drafted:
25 September 2026
Status:
template to be completed and adopted
Operator:
[TO BE COMPLETED]
Approved by:
[TO BE COMPLETED]
Date adopted:
[TO BE COMPLETED]
Date of application:
[TO BE COMPLETED]

Scope: Identified and verified trade receivables. The template must be adapted to the specific set of claims, restrictions on disposal and tax effects.

Related Q&A: Q&A: Settlement 4–5

  1. The parties are A [details], B [details], C [details] and any further entities [details], represented by [persons and basis of authority].
  2. The parties confirm only the receivables itemised below together with source documents. For each, they disclose any dispute, attachment, assignment, security or other restriction. Disputed receivables or those subject to an unresolved restriction are excluded pending separate clarification.
ID and documentCreditorDebtorAmount before / PLNDue dateAmount extinguishedRemainingDue date and method for the remainder
[ ][ ][ ][ ][ ][ ][ ][ ]
  1. Each creditor listed in the table consents to the extinguishment of its identified receivable in the amount shown under "amount extinguished", and the relevant debtor accepts this consent. The arrangements form one interdependent whole. The parties confirm the economic balance of performance in annex [ ]. Any imbalance is described and settled expressly; it is not left to automatic calculation by a platform.
  2. The effect occurs when the complete document bearing the last required signature has been delivered to all parties, provided any additional conditions are met [list or "none"]. The coordinator [person] records that moment and the delivery. Until then, existing obligations remain in force.
  3. The agreement does not transfer receivables. Assignment, assumption of debt or security require separate arrangements and the proper consents. The operator does not become a debtor by keeping the statement.
  4. Remaining balances, interest and costs are set out separately: [table/annex]. Omitting interest from the table is not a presumed waiver. The parties confirm the final statement after the agreement takes effect.
  5. Each party handles its own tax effects and keeps its documents. Amendments require the consent of all parties whose rights they change, taking into account the interdependence of the arrangements.
  6. Governing law, disputes, number of counterparts, form of signature and addresses for service: [TO BE COMPLETED]. Signature and date of each party: [ ].

Illustrative example (not real companies): A owes B PLN 1,230, B owes C PLN 1,230 and C owes A PLN 1,230. Only a valid agreement of all three parties extinguishes these receivables. Without an agreement, existing obligations remain. Where amounts differ, the table shows the difference still payable.

Sources: [1]

E-01 · v1.0

ESG Star Standard — evidence protocol v1.0

Template to be completed and adopted by the parties; requires legal and tax review for each specific implementation.

Version:
1.0
Date drafted:
25 September 2026
Status:
template to be completed and adopted
Operator:
[TO BE COMPLETED]
Approved by:
[TO BE COMPLETED]
Date adopted:
[TO BE COMPLETED]
Date of application:
[TO BE COMPLETED]

Scope: Assessment of evidence quality within a defined scope of an organisation. The matrix and thresholds are a proprietary proposal, not a reproduction of an ISO standard or statutory requirements.

Related Q&A: Q&A: ESG Star 1–5, 9

IDSubjectMetric and unitExample evidenceThematic reference
E1EnergykWh/period; kWh/unit of product or serviceInvoices, meter readings, production data, measurement boundariesVSME
E2GHG emissionstCO2e/period; stated scopes and emission categoriesActivity data, factors with version and source, methodVSME
E3Materials, water, wastekg of material and waste; m³ of water; documented treatment routeRecords, measurements, transfer documentsVSME
S1Occupational safetyNumber of accidents; rate with a stated hours-worked denominatorIncident and working-time records, corrective actionsVSME; SDG 3
S2EqualityRepresentation in %; pay gap in % with defined population and payAggregated HR data, disclosed methodVSME; SDG 5, 10
S3EducationHours/person; change in skills test resultTraining records, before/after assessmentVSME; SDG 4
S4Accessibility and inclusionNumber of barriers identified/removed; scope assessedAccessibility audit, evidence of fixes, user feedbackISO 26000; SDG 10
S5Partnership outcomesNumber of unique beneficiaries and a defined outcomeOutcome measurement, period, partner contributionsISO 26000; SDG 17
G1Governance accountabilityShare of objectives with owner, deadline and reviewResolutions, responsibility matrix, minutesISO 26000
G2Ethics and conflictsNumber of reports, handling time, disclosed conflicts and recusalsProcedures, anonymised log, decisionsISO 26000
G3Suppliers% of suppliers covered by risk assessment with a defined denominatorAssessments, selection rationale, remediation plansISO 26000
G4Data quality% of indicators with complete source, method, period and ownerE-04 cards, data versions, correction historyVSME; ISO/IEC 17029 principles

Each metric is interpreted in the context of sector, size, operational boundaries and base year. An increase or decrease in ethics reports is not on its own evidence of improvement or deterioration. The standard does not require publishing sensitive personal data; S data is presented in aggregated form.

Evidence assessment (for each criterion separately): 0 — no data; 1 — declaration with a responsible person; 2 — documented measurement with method and period; 3 — independently verified evidence within a defined scope. "Not applicable" requires justification and the verifier's approval. Missing data remains missing data, not zero impact.

Conditions for a complete pilot report: all 12 criteria have a status and a card; every criterion material to the scope reaches at least level 2; any claim presented publicly as independently verified reaches level 3 in the relevant scope. Materiality is justified before the assessment and recorded in the report. Failing a condition leads to a gap report, not a positive confirmation of completeness. Critical breaches and an unresolved suspicion of fabrication block a positive decision.

Interpretation: the evidence level is not an ethical judgement of the company. The protocol does not add results up into stars or a rating. A favourable environmental result does not offset violations of human rights or governance principles. A report does not entitle anyone to a designation without E-03 and fulfilment of L-01.

References: VSME serves to organise information; ISO 26000 provides guidance; ISO/IEC 17029 concerns the principles of verification bodies. Linking to these sources does not prove conformity or accreditation. The SDGs are a map of goals, not proof of effect. Statutory reporting obligations (including ESRS) are determined separately according to the specific organisation's obligations.

Sources: [3], [4], [5], [6], [7]

E-02 · v1.0

Verification, appeals and oversight — procedure template

Template to be completed and adopted by the parties; requires legal and tax review for each specific implementation.

Version:
1.0
Date drafted:
25 September 2026
Status:
template to be completed and adopted
Operator:
[TO BE COMPLETED]
Approved by:
[TO BE COMPLETED]
Date adopted:
[TO BE COMPLETED]
Date of application:
[TO BE COMPLETED]

Scope: The E-01 assessment process.

Related Q&A: Q&A: ESG Star 3–8

  1. Application and scope. The application states the unit, scope of activity, period and expected report scope. The coordinator sets the document list and schedule.
  2. Impartiality. The verifier documents competence and declares relationships. A person who advised on preparing the assessed data does not verify their own work. The decision-maker and the appeal reviewer meet the impartiality requirement.
  3. Terms and fees. The parties agree scope, costs, access to evidence and level of work. The fee covers the work regardless of the outcome. Any fee for admission to the ecosystem is a separate item. Sales and advisory are separated from assessment.
  4. Evidence verification. The verifier checks sources, calculations, periods, representativeness and limitations. Sampling and its rationale are described in the report. A site visit takes place where the nature of the evidence requires on-site observation.
  5. Findings and right of reply. Draft findings are sent to the organisation with 10 business days to respond. The verifier considers comments while keeping the original findings and an audit trail. An authorised person issues the decision on the protocol scope.
  6. Validity and monitoring. The report states validity until a given date, at most 12 months. A material change in operations or data, or disclosure of a breach, triggers an earlier review. The organisation reports a material change within 5 business days of becoming aware of it. The report is not a guarantee of future conduct.
  7. Breaches, suspension, withdrawal. Suspected falsification of evidence leads to the decision being put on hold, a fact-finding procedure and remedial action. Suspension of any right to the designation states scope, reason, response deadline and conditions for reinstatement. Withdrawal requires a statement of reasons. Public communication status is updated in line with the agreement.
  8. Appeal. An appeal is lodged within 14 calendar days of service of the decision at [address — TO BE COMPLETED]. A different, impartial person decides within 30 calendar days. The decision states its reasons. The procedure does not limit legal remedies.
  9. Nature of time limits. All time limits above are proposals of a proprietary pilot procedure. Responsible persons are appointed and the procedure is adopted before any assessment starts. The package does not currently name an appointed verifier.

Sources: [5], [6], [7]

E-03 · v1.0

Assessment agreement and conditional ESG Star designation licence — template

Template to be completed and adopted by the parties; requires legal and tax review for each specific implementation.

Version:
1.0
Date drafted:
25 September 2026
Status:
template to be completed and adopted
Operator:
[TO BE COMPLETED]
Approved by:
[TO BE COMPLETED]
Date adopted:
[TO BE COMPLETED]
Date of application:
[TO BE COMPLETED]

Scope: Ordering an assessment and any later right to communicate. As of today the template grants no right to the designation.

Related Q&A: Q&A: ESG Star 4–8

§1. Parties. Client [details], assessment provider [details and competence], designation rights holder [details and basis of rights]. Where these are different entities, their roles and signatures are shown separately.

§2. Subject. The subject is an assessment under E-01 version [ ] for unit [ ], location [ ], period [ ] and scope [ ]. The deliverable is a report with findings and limitations. The fee [amount/taxes/due date] is payable for the agreed scope of work, regardless of its outcome.

§3. Obligations. The client provides lawful access to data and people, truthful information and disclosure of known limitations. The provider is responsible for professional performance of the agreed work, confidentiality and conflict management. Personal data rules are set in an annex reflecting the actual roles.

§4. Licence conditions. This template does not by itself grant a licence. Its effectiveness requires, jointly: proof of rights to the designation, adopted rules of use, fulfilment of the applicable legal requirements for the scheme, completion of an independent assessment and a written activation document signed by the rights holder and the licensee.

§5. Licence scope. The activation document states the designation, scope of use, assessed unit, permitted claims, channels, territory, period, fee or no fee, and decision identifier. The licence is non-exclusive and without the right to sublicense unless otherwise agreed separately. Any claim refers only to the assessed scope and period; it must not be broadened.

§6. Prohibited claims. The licensee does not present the designation as approval by the EU, UN or ISO, or as a guarantee of all aspects of its business. It makes the scope and limitations of the assessment and the current decision status available to the audience at the agreed location [ ].

§7. Suspension and withdrawal. Where there is a justified risk of misleading the audience, the rights holder suspends use of the designation with reasons. The licensee stops new publication upon service of the notice and updates existing materials within the period set in the activation document [period]. Remedying the breach allows a review. Withdrawal of the licence and appeals follow E-02.

§8. Final provisions. Liability, termination, effects of expiry, governing law, court and form of amendments: [agreed provisions]. Absence of licence activation does not waive payment for an assessment actually ordered and performed. Signatures and dates: [ ].

Sources: [5], [6], [7]

E-04 · v1.0

Evidence card and assessment report — template

Template to be completed and adopted by the parties; requires legal and tax review for each specific implementation.

Version:
1.0
Date drafted:
25 September 2026
Status:
template to be completed and adopted
Operator:
[TO BE COMPLETED]
Approved by:
[TO BE COMPLETED]
Date adopted:
[TO BE COMPLETED]
Date of application:
[TO BE COMPLETED]

Scope: Recording a metric and findings.

Related Q&A: Q&A: ESG Star 2–3, 7, 9

Evidence card: ID [ ]; criterion [ ]; unit/site [ ]; boundaries [ ]; period [ ]; metric and unit [ ]; result [ ]; base year and baseline result [ ]; change and calculation method [ ]; method and version [ ]; sources and dates [ ]; data owner [ ]; limitations/uncertainty [ ]; evidence level 0–3 [ ]; N/A justification [ ]; verifier and competence [ ]; date and scope of check [ ]; correction history [ ].

Type of information: planned benefit [ ] / observed result [ ] / verified result [ ] — tick one.

For social impact: group [ ]; number of unique people [ ]; activity [ ]; outcome [ ]; how change is measured [ ]; partner contributions [ ]; attribution limitations [ ]; data protection and form of aggregation [ ].

Assessment report: ID [ ]; standard version [ ]; engagement scope [ ]; method and sample [ ]; set of cards [ ]; gaps [ ]; critical findings [ ]; organisation's position [ ]; resolution of comments [ ]; decision and its scope [ ]; decision-maker [ ]; date [ ]; review by [ ]; conditions for earlier update [ ]; permitted claim [ ]; licence status "not granted" or number of a separate activation [ ]; appeal and outcome [ ].

Sources: [3], [4], [5]

L-01 · v1.0

Launch conditions — decision card

Template to be completed and adopted by the parties; requires legal and tax review for each specific implementation.

Version:
1.0
Date drafted:
25 September 2026
Status:
template to be completed and adopted
Operator:
[TO BE COMPLETED]
Approved by:
[TO BE COMPLETED]
Date adopted:
[TO BE COMPLETED]
Date of application:
[TO BE COMPLETED]

Scope: Documenting readiness. No condition is currently marked as met.

Related Q&A: Q&A: Settlement 1; ESG Star 1, 6

ConditionEvidence required to closeStatus
Operator identity and representationCurrent data and authorityTo be confirmed
Adopted agreements and price listSignatures, versions, datesTo be confirmed
Settlement modelLegal and tax opinion on the specific flowTo be confirmed
Financial services qualificationAssessment of roles, funds and any unitsTo be confirmed
ESG rating qualificationScope analysis under Regulation 2024/3005To be confirmed
Sustainability labellingAnalysis of 2024/825 and applicable national lawTo be confirmed
Rights to the designationProof of title and licence rulesTo be confirmed
Independent verificationCompetence, contract, impartiality, appeals procedureTo be confirmed
Personal data and confidentialityRoles, legal bases, retention, security; Art. 28 GDPR where applicableTo be confirmed
Actual register and archivingImplementation, access, backups, audit trail, operational testTo be confirmed
Status communicationVerified public descriptions and an owner for updatesTo be confirmed

Launch decision: scope [ ]; closed conditions [ ]; open conditions and impact [ ]; owner [ ]; date [ ]; signature [ ]. Only the scope for which the required conditions are met is launched.

Sources: [1], [2], [3], [4], [5], [6], [7]

ESG Star Passport · v1.0

ESG Star Passport — organisation card (template)

Template — no assessment performed

ESG Star Passport is an organisation's digital card describing scope, period, evidence, verifier, status and validity date. At this stage it is only a downloadable template — not an operating register of verified organisations. We do not publish any cards, certificates or results.

FieldContent to be completed
Organisation / register (name, legal form, registration number)[TO BE COMPLETED]
Assessment scope (unit, sites, activity)[ ]
Period covered[ ]
Baseline (base year and baseline result)[ ]
Evidence sources (E-04 cards)[ ]
Evidence levels 0–3 for E1–E3, S1–S5, G1–G4E1 [ ] E2 [ ] E3 [ ] · S1 [ ] S2 [ ] S3 [ ] S4 [ ] S5 [ ] · G1 [ ] G2 [ ] G3 [ ] G4 [ ]
Verifier and competence[ ]
Conflict of interest declaration[ ]
Report ID[ ]
Standard versionESG Star Standard v[ ]
Decision date / review date (max. 12 months)[ ] / [ ]
StatusTemplate / Under assessment / Verified within scope / Update required / Suspended or withdrawn
Limitations and uncertainty[ ]
Separate ESG Star designation licence (E-03)not granted / activation no. [ ]

Evidence levels: 0 no data; 1 declaration with a responsible person; 2 documented measurement with method and period; 3 independently verified evidence. This empty template documents the structure of a future card. The legal qualification of an implemented product, including possible coverage by ESG ratings regulation, is established before launch in line with L-01. A completed card describes only the stated scope and assessment period.

Possible card statuses

  • Template
  • Under assessment
  • Verified within scope
  • Update required
  • Suspended / withdrawn
Download .txt

ESG Star Passport · v1.0

ESG Star Passport — completed card example (illustrative)

ILLUSTRATIVE DEMO

The example below shows what a completed card, the assessment of one criterion and a verification report excerpt would look like. The organisation, evidence, results and persons are fictional. The example is not an assessment, a certificate or a register — no actual card has been issued.

FieldContent (illustrative example)
Organisation / register"Example Brewery" Ltd. (fictional name), reg. no. 0000000000
Assessment scopeone production site (brewhouse and bottling), production activity excluding the distribution network
Period covered01.01.2025 – 31.12.2025
Baselinebase year 2024; scope 1+2 emissions: 410 t CO₂e
Evidence sources (E-04 cards)2025 energy invoices; water consumption report; waste register; employee survey (n=24)
Evidence levels 0–3E1 2 · E2 2 · E3 1 · S1 2 · S2 1 · S3 1 · S4 1 · S5 0 · G1 2 · G2 1 · G3 1 · G4 1
Verifier and competenceexternal verifier (fictional name), experienced in SME environmental audits
Conflict of interest declarationsubmitted; no capital or engagement ties
Report IDESGS-DEMO-2026-001
Standard versionESG Star Standard v1.0
Decision date / review date25.09.2026 / 25.09.2027
StatusUnder assessment (example)
Limitations and uncertaintyno scope 3 data; small-sample employee survey; results cover only the stated scope and period
Separate ESG Star designation licence (E-03)not granted

Illustrative example — it does not describe any actual organisation or assessment.

Example assessment of criterion E1 (energy use and emissions) — illustrative:

- Requirement: documented measurement of energy use and scope 1+2 emissions with method and period. - Evidence: 12 monthly 2025 energy invoices; emissions converted using national factors; methodology note. - Assessment: complete and repeatable measurement, without independent external verification → level 2 (documented measurement with method and period). - Condition for level 3: independent verification of the data by a third party. - The result covers only the scope and period stated in the card.

Verification report excerpt (illustrative):

- Report ID: ESGS-DEMO-2026-001 · Standard: ESG Star Standard v1.0 · Date: 25.09.2026 - Scope: one production site; period: 01.01.2025 – 31.12.2025 - Method: document review, interview with the responsible person, data consistency checks - Findings: 11 of 12 criteria with evidence at levels 1–2; S5 without data (level 0) - Limitations: no scope 3 data; small survey sample; no independent verification of measurements - Recommendation: complete S5 evidence and external verification before a status decision - The report is not an ESG rating or a certificate; it describes only the stated scope and period.

Sources and limits of verification

  1. Polish Civil Code — ELI — Current consolidated text. Art. 353¹ (freedom of contract) and Art. 498–505 (statutory set-off) as reference points for distinguishing contractual settlement from set-off.
  2. Polish VAT Act — ELI — Current consolidated text. The effects of a settlement depend on the type of supply and the taxpayer's situation.
  3. Commission Recommendation (EU) 2025/1710 — VSME — Voluntary sustainability reporting for SMEs. The identity and subject of the document were checked; no compliance audit of the whole matrix against every VSME disclosure was performed.
  4. ISO 26000 — social responsibility — ISO describes the standard as guidance, not a basis for certification.
  5. ISO/IEC 17029 — verification principles — Official description of competence, impartiality and consistency of verification bodies; TarDigRada has not been assessed against the full standard.
  6. Directive (EU) 2024/825 — EU date of application of the transposing measures: 27 September 2026. The status of Polish transposition was not verified at the date of drafting. Requirements for labels and claims must be addressed before any designation is launched.
  7. Regulation (EU) 2024/3005 — ESG ratings — The ESG Star model requires individual qualification; this document does not determine whether it is in or out of scope.

Public sources are substantive references. They do not imply patronage, accreditation or endorsement of the project. Before signing, the templates must be completed and checked against the specific business.

Project and content author: Ada Margo.